OUR TECHNOLOGY
Building Information Modelling (BIM)
Since 2013, BHCC has implemented using BIM for clash detection, quantity take-off, site utilization and tower crane planning, precast planning and visualization, technical coordination and shop drawing production. With BIM, communication and coordination process between consultant, main contractor and sub-contractor has never been this easier. Using BIM technology, we are able to achieve higher and higher productivity with the elimination of redundant and abortive works.





1.VISUALIZATION
2.CLASH DETECTION
3.CRANE PLANNING
4.SITE PLANNING
5.SHOP DRAWING
6.DETAILING FOR ANALYSIS
7.4D SCHEDULE
8.QUANTITY TAKEOFF FOR COST ESTIMATE (5D COSTING)
9.FM (6D)
10.VISUALIZATION &VIRTUAL REALITY